Frequently Asked Questions
When will my order be shipped?
- Orders usually ship out within one week of order date.
When will___be back in stock?
- Typical lead times for polymer lowers is 2 weeks.
- Typical lead time for aluminum lowers is 3-4 weeks.
- Sign up for back in stock notifications and our mailing list to be notified right when products are back in stock.
Can you pre-order products?
- We do not accept pre-orders, waitlist, or backorders; however singing up for back in stock notifications on our website help us to gauge interest for each product.
What materials are the lowers made out of?
- Our polymer lowers are produced by MJF (Multi Jet Fusion) using Nylon 12. The parts are then sand blasted, died black, and shotpeened.
- Our aluminum lowers are machined from 7075 billet aluminum and then hardcoat anodized black.